100%
Design
80%
Construction
Winter 2027
Completion
$3.7M
Project Cost
About this Project
UC Davis Design and Construction Management is improving the ARC Parking Lot (Lot 25) to create a smoother, clearer and more predictable experience for people no matter their preferred mode of transportation. The project will reconfigure the area around the ARC, Orchard Road, La Rue Road, Blue Ridge Road and the Sprocket Bikeway to better separate travel paths and improve circulation.
Planned upgrades include a redesigned entrance, a separated bike lane, a dedicated pedestrian sidewalk, new crossings, updates to the existing bike roundabout, additional bike parking near the ARC, new pedestrian lighting, landscaping, irrigation, paving and striping. To complete the work, Lot 25 will be closed to the public from June 15 through Sept. 18, 2026, with drivers encouraged to use the Pavilion Parking Structure during the closure.
Learn more in a related news article
Construction Updates
Updated Oct. 2, 2026
- Parking lot is open to the public.
- A portion of Lot 25 remains fenced off to accommodate construction
- Bike detour: Portions of the bike path north of the ARC are closed off. Bicyclists are being detoured to bike lanes on Orchard Road at the entrance of the parking lot.
Interactive map
Project Details
| Project Location | Lot 25, near the Activities and Recreation Center |
| Client | Campus |
| Design Team | Cunningham Engineering |
| Contractor | Western Engineering |