Skip to main content
Design and Construction Management
UC Davis Logo
UC Davis Logo
Design and Construction Management
  • Intranet (DCM Staff Only)
  • CPMA
  • User Guides
  • Campus Design Guide
  • Current Projects | Interactive Map
  • Bidding Opportunities
Main navigation (extended config)
  • About
    • Org Charts
    • Leadership Team
    • Operating Units
      • Campus Planning
      • Capital Projects
      • Contract Management
      • Engineering
      • Integrated Planning & Design
      • Real Estate Services
    • Staff Directory
      • Staff Profiles
    • Job & Internship Opportunities
    • Contact Us
    • FAQs
  • Project Information
    • Explore Current Projects
      • Featured Projects
      • Interactive Map
      • Construction Cameras
    • Road Closures
    • Big Shift
    • Security Investments
    • Seismic Safety
      • Seismic Improvement Projects
  • Campus Community
    • Start a New Project
      • Project Initiation
      • Furniture Services
      • Service Rates and Agreements
    • Space Services
    • FacilitiesLink
    • Home Loan Programs
  • Designers
    • CPMA
    • Campus Design Guides
    • RFQs
  • Contractors
    • CPMA
    • RFQs
    • Bidding Opportunities
    • Awarded Contracts
    • Bid Opening Results
  • News
    • DCM News
    • Subscribe to Our Newsletter
    • Press Coverage
    • Events

ARC Parking Lot Safety Improvement Project

Breadcrumb
  1. Home
  2. Featured Projects
  3. ARC Parking Lot Safety Improvement Project
Newly installed bike circle at the south west corner of Lot 25

100%

Design

80%

Construction

Winter 2027

Completion

$3.7M

Project Cost

About this Project

UC Davis Design and Construction Management is improving the ARC Parking Lot (Lot 25) to create a smoother, clearer and more predictable experience for people no matter their preferred mode of transportation. The project will reconfigure the area around the ARC, Orchard Road, La Rue Road, Blue Ridge Road and the Sprocket Bikeway to better separate travel paths and improve circulation.

Planned upgrades include a redesigned entrance, a separated bike lane, a dedicated pedestrian sidewalk, new crossings, updates to the existing bike roundabout, additional bike parking near the ARC, new pedestrian lighting, landscaping, irrigation, paving and striping. To complete the work, Lot 25 will be closed to the public from June 15 through Sept. 18, 2026, with drivers encouraged to use the Pavilion Parking Structure during the closure.

Learn more in a related news article

Construction Updates

Updated Oct. 2, 2026

  • Parking lot is open to the public. 
  • A portion of Lot 25 remains fenced off to accommodate construction
  • Bike detour: Portions of the bike path north of the ARC are closed off. Bicyclists are being detoured to bike lanes on Orchard Road at the entrance of the parking lot.

Interactive map

Tags

Featured Projects Campus Engineering

Project Details

Project LocationLot 25, near the Activities and Recreation Center
ClientCampus
Design TeamCunningham Engineering
ContractorWestern Engineering

Project Manager

Portrait Image
portrait of Maryanne Ranasinghe

Maryanne Ranasinghe

Position Title
  • Project Manager
❮  Previous Project
Next Project  ❯
Site Logo

Contact Us

Address

255 Cousteau Place
Davis, California 95618

General Office Contact

Monday: 9:00 am to 2:00 pm
Tu - Thu: 8:00 am - 5:00 pm
Friday: Message service only.

530-754-1111

Full Staff Directory

Email Us

Operational Units

Campus Planning

Capital Projects

Contract Management

Engineering

Integrated Planning & Design

Real Estate Services

 

Partner Links

Finance, Operations and Administration

Arboretum and Public Garden

Facilities Management

Safety Services

Supply Chain Management

Office of Sustainability

 

UC Davis footer logo
This site is officially grown in SiteFarm.